Ethan Allen
Ethan Allen optimized the complete
frame production process.
As a result, the company has saved time, labor and costs
Ethan Allen optimized the complete
frame production process.
As a result, the company has saved time, labor and costs
Vanguard was able to increase material utilization resulting in 12% material savings and improve throughput significantly.
The frames manufacturer for upholstered furniture improved material usage, reduced floor space and upgraded process controls.