
SAP Integration at Multi-Ply
This case study highlights the successful integration of Plataine’s Total Production Optimisation (TPO) with SAP S4/Hana at Multi-Ply Components Ltd.

This case study highlights the successful integration of Plataine’s Total Production Optimisation (TPO) with SAP S4/Hana at Multi-Ply Components Ltd.

Multi-Ply’a planner’s routine has changed dramatically: they now spend only up to
an hour a week updating the plan and can quickly respond to unforeseen challenges on the factory floor.

Kanfit is a leading manufacturer of detailed and primary parts, ready-to-mount assemblies, and subassemblies for the aerospace, defense and medical device industries.

MRAS Achieved 96% first-time-right yield for composite Nacelle structures with Plataine’s AI software solutions.

Plataine’s AI software solutions optimize and automate Kanfit’s composite production processes

ACITURRI reduced material waste by 4.6% Achieved a high level of automation & efficiency

Light & Strong reduced errors and material waste in their facility to zero

Renault F team gained full digital part traceability and faster time-to-part

Learn how they increased material savings by 3% and reducing errors by 20%