4.5% reduction in prepreg composite
material waste
Overview
A joint venture between Kaman Aerospace Group and Kineco. A manufacturer of advanced composite structural parts and assemblies for Aerospace and Defense was interested to find an advanced software solution to help them create optimal production plans to reduce material waste during the manufacturing process.
Some of the achieved results:
4.5% reduction in prepreg composite material waste
Improved efficiency and capacity
Increased quality and traceability
Read the case study to overview all benchmarks and to learn what was exactly done.