Case Studies

  • Harbin Hafei Airbus

    Harbin Hafei Airbus partnered with Plataine and Argosy for improved traceability, efficiency and yield, and to develop the best practices.

    Read the Case Study
  • IAI

    Israel Aerospace Industries ramps production while reducing costs and improving quality, thanks to integrated optimization software.

    Read the Case Study
  • Composites Horizons

    A comprehensive implementation plan for a successful installation of TPO FabricOptimizer allows CHI to go live in only 2 months.

    Read the Case Study
  • Elbit Systems Cyclone

    The ability to mix orders of the same material has not only increased Cyclone’s material yield but its whole ‘manufacturing yield’ has improved double digits.

    Read the Case Study
  • Ethan Allen

    What Ethan Allen discovered is that a change of this magnitude reverberates through the entire upholstery manufacturing process.

    Read the Case Study
  • Bassett

    All production steps, except router cutting of frames, are integrated into independent manufacturing cells.

    Read the Case Study
  • Vanguard Furniture

    Plataine’s TPO applications optimize processes at Vanguard Furniture.

    Read the Case Study
  • Bernhardt

    A new software system helped a manufacturer of frames for upholstered furniture improve material usage, reduce floor space and upgrade process controls.

    Read the Case Study

Contact Us